Jump to content

vvilliamm

Members
  • Posts

    7
  • Joined

  • Last visited

    Never
  • Speed Test

    My Results

Everything posted by vvilliamm

  1. sigh waiting and wondering if i will actually receive around 7.1 mbps
  2. hmm how do i edit the top post? any way i want to add that the 7.1Mbps is for 37.99 now instead of 42.99 and now im screwed -.- im paying 32.99 for the first 3 months and then 42.99 =/ i called several times trying to lower it to 37.99 no hope constantly threaten by my 1 year commitment. damn i was on an good 3.0 Mbps no contract for the past 2 years since my contract expired damn =/ sigh i miss Tmobile Customer Service -.- verizon customer service is horrible i loose 32.99 32.99 32.99 42.99-5=37.99 42.99-5=37.99 42.99-5=37.99 42.99 42.99 42.99 42.99 42.99 42.99 470.88 if i were on 37.99 for 12 months 455.88 contract termination was around 40 something that's what the lady said so in the end i loose .
  3. today i have checked the status around 79% i have around 6.3 today. :::.. Download Stats ..::: Download Connection is:: 6274 Kbps about 6.3 Mbps (tested with 6152 kB) Download Speed is:: 766 kB/s Tested From:: https://testmy.net/ (Main) Test Time:: 2009/03/09 - 6:12am Bottom Line:: 109X faster than 56K 1MB Download in 1.34 sec Tested from a 6152 kB file and took 8.033 seconds to complete Download Diagnosis:: Looks Great : 8 % faster than the average for host (verizon.net) D-Validation Link:: https://testmy.net/stats/id-PG1WVLZOR User Agent:: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.9.0.7) Gecko/2009021910 Firefox/3.0.1;MEGAUPLOAD 1.0 [!]
  4. Well I did serveral testes over the days my first time testing landed me an 4.2 Mbps and then I did another one another day 5.1 and then I did it again 6.1 so I just wrote that down . it says 74% in my order status as completed and I just redid another test came out to be 6.4
  5. the sad part is... their current price dropped for 7.1 to 37.99 =/ i wonder will they do an update in price also for me since im currently under 42.99 their gay sometimes about price changes until you keep calling 20 times a day =]. damn i should of waited two more days till i ordered so i could get it for 37.99 =/
  6. i ordered 7.1 upgrade at 3/05/09 and it should be done by 3/10/09 i received my modem at 3/06/09 =] put it in and i got around 6.1 mbps i was wondering when its finished processing will i get near to 7.1 mbps?
×
×
  • Create New...