jchen Posted March 17, 2010 CID Share Posted March 17, 2010 For a project at school I have to construct 2 graphs. About 2 months ago I did a similar project with using graphs and all that. well the problem is the date and time (x-axis) for this project is completely wrong, I have the time as 3/--/10 2:00 AM or PM and it shows 3/--/10 12:00 AM/PM. No matter WHAT I do, it doesn't change at all.... now for the previous problem I did not have that problem at all. It was a dual axis graph I'm not sure if it's because of that, that is making the problem.... How do I solve this? I need to fix it by Friday, and I have no idea how. the graph doesn't look right :/ PLEASE REPLY BEFORE FRIDAY!!!!!! Quote Link to comment Share on other sites More sharing options...
CA3LE Posted March 18, 2010 CID Share Posted March 18, 2010 For a project at school I have to construct 2 graphs. About 2 months ago I did a similar project with using graphs and all that. well the problem is the date and time (x-axis) for this project is completely wrong, I have the time as 3/--/10 2:00 AM or PM and it shows 3/--/10 12:00 AM/PM. No matter WHAT I do, it doesn't change at all.... now for the previous problem I did not have that problem at all. It was a dual axis graph I'm not sure if it's because of that, that is making the problem.... How do I solve this? I need to fix it by Friday, and I have no idea how. the graph doesn't look right :/ PLEASE REPLY BEFORE FRIDAY!!!!!! How are you building these graphs... not sure I quite understand what your talking about but I'd like to help if I can. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.